Floor boards

Floor boards

Floor decking steel sheet
Floor deck means pressed steel plate not only as a permanent template of concrete floor, but also as load-bearing bar at the bottom of the floor to participate in the stress calculation, to work together with concrete to form a composite floor slab. 

Performance of composite floor slab: Saving a lot of temporary template; Leaving out all or part of the template support; Cut concrete dosage; Lighten permanent load of the structure; Saving a lot of labor force in transport, storage and installation, which has more important significance in both high-rise buildings and seismic regions; Reducing the workload; Easy laying pipelines of communication, electric power and heating; Also easy laying of heat preservation, sound insulation, heat insulation and vibration isolation material; Improving the floor performance; full playing good steel's tensile strength and ductility and concrete's compressive strength and large stiffness. 
 

 

Name

Modle

Picture

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

Open-type  Floor Deck Sheet

YX70-200-600 

0.8

89.35

23.7

0.9

103.5

25.7

1.0

118.6

31.6

1.2

149.8

40.01

YX75-200-600 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.6

60.38

16.42

0.8

76.57

20.31

1.0

100.64

27.37

1.2

128.19

35.96

YX75-293-880

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.7

102.3

23.481

0.9

122.8

29.52

1.2

164.4

40.464

1.5

205.5

50.313

YX76-344-688

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

91.62

23.46

1.0

119.38

30.61

1.2

142.01

38.98

1.4

167.34

43.90

1.5

178.70

46.80

YX51-253-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.80

19.30

1.0

67.30

24.20

1.2

80.80

29.20

YX51-240-720

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

47.52

17.9

0.9

53.8

20.1

1.0

58.1

22.9

1.2

68.7

28.4

YX51-304-914

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

106.6

24.46

1.0

127.9

30.76

1.2

171.3

42.15

1.5

214.1

52.41

Close Type Floor Decking Sheet

YX65-185-555

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.95

25.614

1

67.44

32.018

1.2

80.928

36.02

Dovetail Type Steel Floor Sheet

YX51-190-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04

YX51-200-600 

 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04


Note: Matters needs attention in floor deck installation 
Column grid spacing generally is 5~9.0m*8~15m and steel structure beam spacing is 3m. Fabrication length of floor deck is 4.97~8.97m. Transport, ation and installation are more difficult, especially for floor deck with arc vertical hoisting. It is difficult to coat between the beams and narrow down, which also disrupts the second beam welding normal working procedure. Fabrication length is limited to 3~6m, which can avoid lifting problems of secondary girder in vertical transportation. When using special soft sling in hoisting, one should check whether the soft slings are torn or cut off. When floor deck is placed aside the steel beam, it should avoi, , , d probe. When operating, personnel should wear seat belts and ensure that sides' parts are on the perimeter security line. Before using penetration welding spot in welding connection, one should prepare leftover material arc welding, adjust welding current adjustment. Because of no horizontal template and the vertical support plate at the bottom of the floor deck, material should not be too concentrated when watering the concrete. It adopts the planar vibrator and apportions vibrating in a timely manner.

Hits:9508 Time:[2020-2-26]

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩最新视频一区二区三| 国产精品亚洲欧美日韩久久| 一级成人a毛片免费播放| 麻豆md国产在线观看| 亚洲va中文字幕| 视频一区二区三区欧美日韩| 欧美一级特黄乱妇高清视频| 2018精品国产一区二区| 美女18黄| 男女午夜视频| 欧美videosex性欧美成人| 亚洲成色999久久网站| 99re国产精品| 男人下面进女人下面视频免费 | 黄色在线免费观看| 日韩波多野结衣| 精品久久久久久亚洲精品| 国产精品福利影院| 二区久久国产乱子伦免费精品| 成人18视频| 色费女人18女人毛片免费视频| 精品在线免费视频| 亚洲三级影视| 国产99免费视频| 日韩a一级欧美一级| 日韩国产成人精品视频| 日韩三级免费观看| 国产成人免费高清在线观看| 亚洲无线乱码高清在线观看一区| 无码日韩精品一区二区免费| 小明永久视频| 国产美女一级ba大片免色| 在线色av| 日韩黄在线观看免费视频| 日韩亚洲一区中文字幕在线| fulidown国产精品合集| 久久香蕉网| 久久精品vr中文字幕| freexxx日本| a级毛片无码免费真人| 无遮挡污视频|