日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Homepage > Product > Zhuhai stone factory
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://www.ewqkq.cn

Zhuhai stone factory

Zhuhai stone factory

Zhuhai Quarry Workshop
Project Description
Guangdong Changheng Group occupies an area of 600000 squire meters,
Measures to prevent dust generated by crushing stones is using the closed steel structure workshop made by Foshan Sheng Bang Steel Structure Co.,(for short “SBS”). The gravel is mainly used for the processing of base-level bedding, highway engineering, airport reclamation and so on. The breaking production line is the leading technology in China with high productivity and high efficiency. The crushing site is close to the dock and the aggregate can be transported by a two-kilometer large conveyor belt to the transport ship.

Project Prominent point
With prefabricated steel structures, high-efficiency deep pre-fabrication is carried out in advance by SBS, which greatly increases construction efficiency and saves twice the time of traditional concrete or steel construction on site. Because it is crushed aggregates, dust is very diffuse, in order to achieve the effect of green mining. SBS seals the production line of the crushing yard, and cooperates with dust-collecting environmental protection equipment, spray atomization and other dust prevention measures. The workshop is completely closed, which is beneficial to the production without weather, but also provides workers with a good working environment, greatly mobilizes workers' enthusiasm for production, and promotes production efficiency. As the crushing equipment needs to periodically replace the crusher's dental plate and vibrating screen, the factory is equipped with a 25-ton crane and can go through every lifting position. It can be produced or overhauled without fear of wind and rain in a closed workshop.
In the Zhuhai Quarry Steel Structure Workshop project undertaken by SBS prefabricated steel structure deep prefabrication construction technology is applied to the prefabrication of steel structures such as pipe frames and equipment platforms. Designed through 3D professional modeling, detailed to the connection position and bolt arrangement. The professional design team conducted a detailed technical investigation, eliminated the difficulties of prefabricated steel structures, multiple nodes, high design requirements, and short installation time, and completed efficiently all production difficulties. The prefabricated depth of all steel structures reaches 98%, and the tolerances of the axis lines, elevations, and joint positions of the system's pipe racks are controlled within 2mm, and there are no reworks beyond the millenium pipe racks. The hole position, aperture, quantity, etc. of several million bolts are matched with the field installation with no mistake.

Project achievement
1.Green and closed mining
The traditional mining work is generally open-pit mining. Due to the relatively large environmental pollution caused by aggregate crushing and screening dust, closed mining significantly reduces the environmental pollution caused by mining. In response to President Xi Jinping’s call to “Lucid waters and lush mountains are invaluable assets.”, the project was conducted by the design team of SBS on site and the technicians used a three-dimensional approach. Software modeling, detailed node construction, simulation of on-site assembly effects, and solving the problem of closed mining restricted by space.

2.Steel structure workshop: weatherproof, anti-vibration, closed production, prevent dust
The overall design of the steel structure is particularly critical for the entire building. The design team of SBS first designs the floor plan using CAD software in Zhuhai quarry workshop, then uses 3D software to model it, and the data is then modeled by the chief engineer. Analyze and contrast, design the scheme that suits the actual demand of the workshop most, make the steel structure workshop reach weatherproof, anti-vibration, closed production, prevent dust
After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.
With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

Zhuhai quarry steel structure design drawings and installation drawings are as follows

設計圖.png

Quarry workshop steel column installation

With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

未命名1.png

Quarry workshop steel beam installation

---2

Quarry workshop wall installation

After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.

---3

Zhuhai steel structure quarrying workshop - multiple transmission belts

20180522101628_8354294


 

 

Hits:12091 Time:[2020-9-5]

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 波多野结衣xxxx性精品| 成年人在线网站| 波多野结衣视频一区二区| 国产高级黄区18勿进一区二区| 精品国产拍拍拍无遮挡| 香蕉国产人午夜视频在线观看| 免费a视频在线观看| 天天干女人| 日本一区二区在线视频| 国产伦人伦偷精品视频| 黄色网址免费在线| 在线视频国产一区| 欧美亚洲中日韩中文字幕在线| 日韩成人片| a色在线| 欧美禁片在线观看免费| kk4kk免费视频毛片| 欧美一级在线观看| 国产高清一区二区三区视频| 在线视频免费观看a毛片| 久久精品视频久久| 久久久无码精品亚洲日韩按摩| 奇米影视亚洲色图| 激情综合色综合久久综合| 欧美xxx性| 久久午夜宅男免费网站| 国产欧美亚洲精品| 婷婷亚洲综合五月天在线| 99精品视频观看| 色黄网站在线观看| 日韩国产欧美成人一区二区影院 | 午夜视频免费在线播放| 成年做羞羞免费观看视频网站| 西西人体国模欢欢啪啪写真| 日韩第六页| 久久久久国产一级毛片高清板| 久操网视频| 亚洲人欧洲日韩| 欧美成人午夜视频免看| 看黄色特级片| 午夜看片在线观看|