steel villa
1.STEEL STRUCTURE VILLA
Steel structure villa industrial production using a combination of standard components, it has many advantages: flexible design, cost control, construction period is short, fast and convenient way to pay, environmental protection, good shock resistance, safer, more flexible, more savings energy. Steel structure villa widely built in tourist attractions, the seaside resort around the house or other purposes. If you want to understand the benefits of more steel structure villa, please contact us, we will answer your questions in detail.
2.Steel Structure Panel material
Steel structure panel material: including wall panel and roof panel
Sandwich core materials: EPS, PU, rock wool, glass wool
Thickness of sandwich panels: 50mm, 75mm, 100mm, 150mm
Single color plate material thickness: 0.376mm, 0.426mm, 0.476mm
3.Product details
Product Name |
Prefabricated Steel Structure Villa | |
Specification |
Foundation |
Concrete and Steel |
Support |
X or V types, angle steel or round tube | |
Surface |
Two layers and anti-rust paint | |
Color |
White, Grey, Blue, Green, etc | |
size |
Designed by your requirement | |
Advantages |
1. Stable Construction | |
Main component |
Base materials |
Cement and steel foundation bolts |
Main frame |
H beam (welded or hot rolled) | |
Material |
Q35B,Q345B | |
Purlin |
C purlin (C120-320) or Z Purlin (Z100-200) | |
Bracing |
Tie bar, lateral bracing, column bracing, knee bracing, etc | |
Bolt |
Normal bolt, high strength bolts, Galvanized bolt | |
Roof & wall |
Sandwich panel, steel corrugated sheet | |
Door |
Sliding door , rolling shutter | |
Window |
PVC window, aluminum-alloy Window | |
Accessories |
Skylight, ventilation, downpipe and galvanized gutter etc . |
4.Steel structure design common norms are as follows:
5.Guidance installation
Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
1) Translator or assistant on site.
2.)All costs raised including:
A. visa fee
B. Round trip flight ticket
C. Accident insurance for the supervisor during the period
D. Accommodation
E. Daily meals
F. Internet
G. Local traffic fee (if any)
3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4)Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:
Contact way
1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
3)Foshan, Guangdong Province, China
4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682