Steel Stables
1.SBS STEEL STRUCTURE ANIMAL HUSBANDRY
Steel structure building is a new type of prefabricated steel structure barn. The main steel frame is formed by linking up H-section, Z-section and U-section steel components while roof and wall using a variety of panels. It meets the requirement for the sheep pan perfectly in terms of the strength. The load bearing parts are mainly steel structures, including steel columns, steel beams, steel structural basements, bracing systems for wall and roof. The Main Structure is usually made of Q345 Steel while the purlins and bracing system are made of Q235 Steel. They are the most common steel materials used for china steel structure workshop in China.
2.Steel structure panel materials
3. Provide data
Item Name | Steel structure building |
Size | Length, Width, Roof height and Eave Height |
Roof and Wall | PU, EPS, Rock Wool sandwich panel |
Door and Window | PVC or Aluminum Alloy |
Column and Beam | Hot rolled H section , I section or Galvanized |
Purlin | C-Section and Z-section |
Surface | 2 primer and 1 finished paint |
Local Climate | 1. wind speed 2. Rain load 3. Snow load 4. Earthquake grade if any, etc. |
Crane parameter | If need crane beam, parameter is in need. |
Drawing | 1. Quote as clients' drawing 2. Design as per clients' requests. |
Package | In container or as per requests. |
Load in | 20 ft', 40 ft' GP, /HQ/OT container |
4.Transportation
Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:
1). Seaworthy
In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.
2).Package for the steel frame
If you want to use the 40 HQ container to transportation the whole steel structure product. You can do the steel frame to package ,use the cable wire to fix. But you must paid for the steel frame and baling charges.
5.Guidance installation
Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
1) Translator or assistant on site.
2) All costs raised including:
A. visa fee
B. Round trip flight ticket
C. Accident insurance for the supervisor during the period
D. Accommodation
E. Daily meals
F. Internet
G. Local traffic fee (if any)
3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4)Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:
6.Service flow path:
Discussing Project——Design Plan Drawing——Budget & Quote——Confirm Drawing&Quotation——Sign the Contract——Make the shop Drawing——Manufacturing——Transportation——Shipping——Foundation Ready——Guidance Installation——Finshed Installation
Contact way
1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
3)Foshan, Guangdong Province, China
4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682