日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Homepage > Product > Steel Racecourse
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://www.ewqkq.cn

Steel Racecourse

Steel Racecourse

 

 

Steel Racecourse

1.SBS STEEL STRUCTURE ANIMAL HUSBANDRY
Steel structure building is a new type of prefabricated steel structure barn. The main steel frame is formed by linking up H-section, Z-section and U-section steel components while roof and wall using a variety of panels. It meets the requirement for the sheep pan perfectly in terms of the strength. The load bearing parts are mainly steel structures, including steel columns, steel beams, steel structural basements, bracing systems for wall and roof. The Main Structure is usually made of Q345 Steel while the purlins and bracing system are made of Q235 Steel. They are the most c

 

 

2.The detail material for the steel structure:

The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate .

 

 

3.Product details

Main structure Steel Welded H Section
Purlin C Section Channel or Z Section Channel
Roof Cladding Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil
Wall Cladding Sandwich Panel or Corrugated Steel Sheet
Tie Rod Circular Steel Tube
Brace Round Bar
Column & Transverse Brace Angle Steel or H Section Steel or Steel Pipe
Knee Brace Angle Steel
Roof Gutter Color Steel Sheet
Rainspout PVC Pipe
Door Sliding Sandwich Panel Door or Metal Door
Windows PVC/Plastic Steel/Aluminum Alloy Window
Connecting High Strength Bolts
Packing Can be loaded into 40ft'GP/HQ/OT, or 20 ft'container.
Drawing We can make the design and quotation according to your requirement or your drawing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.Transportation:

Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:
1)40'HQ and 40'open top container
In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.


2)Break bulk
At special circumstances, some large construction size will be more than 40 'HQ and 40' open top containers internal dimensions, we suggest customer use trucks, flatbed trailer etc to transport the large construction component to the pier from the factory, then ship by port lifting, so while booking space,customers should book the break bulk. We will cooperate with the customer to provide them the size and weight of the goods, in order to book a reasonable space.
Remark:
When components are shipped to the site, due to various reasons of transport may cause component deformation (generally for bending, damage to the paint film, etc.), can be in the scene to correct, at present the correction method is generally divided into cold straightening and hot straightening.
For bending component, do the mechanical gagging with oil pump, also can use flame (C2H2 and pure oxygen mixed) to the hot straightening, after correction, the paint film that damaged must be repaired.


 

 

5.Guidance installation
Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
1) Translator or assistant on site.
2.)All costs raised including:
  A. visa fee 
  B. Round trip flight ticket
  C. Accident insurance for the supervisor during the period
  D. Accommodation
  E. Daily meals
  F. Internet
  G. Local traffic fee (if any)
3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4)Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:

 

Contact way

1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
3)Foshan, Guangdong Province, China
4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682

Hits:8524 Time:[2020-2-26]

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 无遮挡免费视频| 亚洲黄在线观看| 日韩一区二区三区免费体验 | 免费黄网在线| 香蕉久久综合| 亚洲国产模特在线播放| 男女男精品网站免费观看| 国产a国产| 黄色成人在线播放| 一级做a爱过程免费观看| 免费人成在线观看网站品爱网| 免费日比视频| 成人久久18免费软件| 成人爱做日本视频免费| 97青草香蕉依人在线播放| 91精品国产高清久久久久久| 高清一级做a爱过程不卡视频| 五月天色婷婷在线| 天天曰夜夜曰| 国产成人三级| 全黄冷激性性视频| 制服丝袜视频在线观看| 亚欧在线一线| 亚洲一区二区三区免费| 天天躁夜夜躁| 国产欧美国产精品第二区| 成人一级| 国产成人18黄网站免费 | 人与禽的免费一级毛片| 天堂中文资源在线观看| 天天射天天干天天舔| 日韩欧美三级在线| 1024cc香蕉在线观看免费| 成人视屏网站| 模特精品视频一区| 免费丝袜足控网站| 天天插天天搞| 农村偷人一级超爽毛片| 午夜免费视频观看| aⅴ在线免费观看| 激情综合五月|