Steel structure hangar
1.The detail material for the steel structure
The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate .
2.Introduction of steel structure hangar
The structure is made of steel or galvanized steel. Different sections and sizes of the parts will be needed for different span. Wall and roof envelope can be made of steel sheet or sandwich panel, which have much different price and function. The insulation layer of the sandwich panel can be made of different materials, such as EPS, PU, Rock Wool etc, which have different insulation rate.
Advantages:
1)Wide span: single span or multiple spans, the max span clear distance is 36m, without middle columns.
2)Low cost: unit price range from USD35 to USD70/square meter FOB according to customer’s request.
3)Fast construction and easy in installation
4)Long service life: more than 50 years.
5)Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving.
3.Quotation will be made against customer's provided information below:
Item Name | Steel structure building |
Size | Length, Width, Roof height and Eave Height |
Roof and Wall | PU, EPS, Rock Wool sandwich panel |
Door and Window | PVC or Aluminum Alloy |
Column and Beam | Hot rolled H section , I section or Galvanized |
Purlin | C-Section and Z-section |
Surface | 2 primer and 1 finished paint |
Local Climate | 1. Wind speed 2. Rain load 3. Snow load 4. Earthquake grade if any, etc. |
Crane parameter | If need crane beam, parameter is in need. |
Drawing | 1. Quote as clients' drawing 2. Design as per clients' requests. |
Package | In container or as per requests. |
Load in | 20 ft', 40 ft' GP, /HQ/OT container |
4.Guidance installation
Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
1) Translator or assistant on site.
2) All costs raised including:
A. visa fee
B. Round trip flight ticket
C. Accident insurance for the supervisor during the period
D. Accommodation
E. Daily meals
F. Internet
G. Local traffic fee (if any)
3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4) Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:
5.Contact way
1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
3)Foshan, Guangdong Province, China
4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682