Floor boards

Floor boards

Floor decking steel sheet
Floor deck means pressed steel plate not only as a permanent template of concrete floor, but also as load-bearing bar at the bottom of the floor to participate in the stress calculation, to work together with concrete to form a composite floor slab. 

Performance of composite floor slab: Saving a lot of temporary template; Leaving out all or part of the template support; Cut concrete dosage; Lighten permanent load of the structure; Saving a lot of labor force in transport, storage and installation, which has more important significance in both high-rise buildings and seismic regions; Reducing the workload; Easy laying pipelines of communication, electric power and heating; Also easy laying of heat preservation, sound insulation, heat insulation and vibration isolation material; Improving the floor performance; full playing good steel's tensile strength and ductility and concrete's compressive strength and large stiffness. 
 

 

Name

Modle

Picture

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

Open-type  Floor Deck Sheet

YX70-200-600 

0.8

89.35

23.7

0.9

103.5

25.7

1.0

118.6

31.6

1.2

149.8

40.01

YX75-200-600 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.6

60.38

16.42

0.8

76.57

20.31

1.0

100.64

27.37

1.2

128.19

35.96

YX75-293-880

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.7

102.3

23.481

0.9

122.8

29.52

1.2

164.4

40.464

1.5

205.5

50.313

YX76-344-688

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

91.62

23.46

1.0

119.38

30.61

1.2

142.01

38.98

1.4

167.34

43.90

1.5

178.70

46.80

YX51-253-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.80

19.30

1.0

67.30

24.20

1.2

80.80

29.20

YX51-240-720

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

47.52

17.9

0.9

53.8

20.1

1.0

58.1

22.9

1.2

68.7

28.4

YX51-304-914

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

106.6

24.46

1.0

127.9

30.76

1.2

171.3

42.15

1.5

214.1

52.41

Close Type Floor Decking Sheet

YX65-185-555

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.95

25.614

1

67.44

32.018

1.2

80.928

36.02

Dovetail Type Steel Floor Sheet

YX51-190-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04

YX51-200-600 

 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04


Note: Matters needs attention in floor deck installation 
Column grid spacing generally is 5~9.0m*8~15m and steel structure beam spacing is 3m. Fabrication length of floor deck is 4.97~8.97m. Transport, ation and installation are more difficult, especially for floor deck with arc vertical hoisting. It is difficult to coat between the beams and narrow down, which also disrupts the second beam welding normal working procedure. Fabrication length is limited to 3~6m, which can avoid lifting problems of secondary girder in vertical transportation. When using special soft sling in hoisting, one should check whether the soft slings are torn or cut off. When floor deck is placed aside the steel beam, it should avoi, , , d probe. When operating, personnel should wear seat belts and ensure that sides' parts are on the perimeter security line. Before using penetration welding spot in welding connection, one should prepare leftover material arc welding, adjust welding current adjustment. Because of no horizontal template and the vertical support plate at the bottom of the floor deck, material should not be too concentrated when watering the concrete. It adopts the planar vibrator and apportions vibrating in a timely manner.

Hits:9509 Time:[2020-2-26]

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产精欧美一区二区三区| 免费污污视频网站| 中文字幕一区二区三区5566| 韩日色| 五月天婷婷色| 性欧美videofree高| 亚洲伊人成综合人影院小说| 欧美性猛交ⅹxxx乱大交禽| 黄色一级大片视频| 亚洲日本va中文字幕区| 亚洲国产成人久久77| 无遮羞肉体动漫影院免费版| 国产黄色大片| 黄网在线看| 欧美一级视频高清片| 福利片在线| 极品色在线精品视频| 精品一区二区三区在线观看l | 天天摸夜班摸天天碰| 午夜影院伦理片| 日韩国产欧美一区二区三区在线| 天天好b| 钻石午夜影院| 人人干日日干| 成人叼嘿视频免费网站| 国产凹凸一区在线观看视频| 免费被黄网站在观看| 久久亚洲成a人片| 亚洲成aⅴ人片在线影院八| 免费国产zzzwww色| 亚洲国产天堂久久综合9999| 亚洲精品手机在线观看| 中文字幕亚洲综合久久202| 全免费午夜一级毛片真人| 日韩一级片免费看| 欧美乱淫| 婷婷狠狠| 久久久91精品国产一区二区三区| 日韩国产成人精品视频| free性china中文| a毛片久久免费观看|