Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2039

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 欧美成人午夜影院| 黄色片一级视频| 黄色福利视频网站| 丝瓜着色的视频| 欧美一级www片免费观看| 亚洲黄色在线视频| 一级一级一级毛片| 亚洲国产午夜精品理论片的软件| 99精品国产综合久久久久| 国产欧美高清| 久久在现| 国产精品小黄鸭一区二区三区| jpnesxxx日本| 精品欧美成人高清视频在线观看 | 欧美日韩视频一区二区三区| 日日摸夜夜添夜夜添影院视频| 一及黄色片| 天天操天天艹| 国产自在线拍| 热久久精品免费视频| 国产日韩精品欧美一区喷水| 国产一级高清视频| 欧美一级日韩一级| 性欧美videos粗暴| 成人午夜毛片在线看| 亚洲综合久久久久久888| 2021入口一二三四麻豆| 欧美性生活网址| 伊人www| www.男女| 成人影院在线观看视频| 欧美精品三级在线| 免费v片在线观看视频网站| xxxx国产| 99re在线精品视频| 一区二区三区国产| 日韩亚洲欧美视频| 久久国产精品广西柳州门| 欧美一级成人| 欧美精品videosex另类| 久久综合狠狠综合久久97色|