日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2429

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 看黄视频| 欧美精品在线观看视频| 亚洲系列中文字幕一区二区| 天堂久久久久va久久久久| 欧美一区视频在线| 91视频首页| 免费观看污污视频| 综合网天天| 人人澡人人草| 夜夜cao| 国产专区精品| 国产大片黄| 一本大道香蕉视频在线观看| 午夜免费片| 欧美国产小视频| 久久天堂视频| 国产日韩欧美综合色视频在线| 小明tv| 成年片人免费www| 欧美日本黄色| 99国内精品| 日韩欧美在线视频观看| 大黄毛片| 欧美在线黄色| 黄色影院在线观看| 亚洲大片在线观看| 国产成人www免费人成看片| 美女色黄| 国产精品麻豆a啊在线观看| 狠狠干伊人| 国产午夜免费视频| 欧美白人最猛性xxxxx| 中文字幕伊人| 怡红院成人g影院| 成年王色男女免费观看| 最近日本中文字幕免费完整| 国产精品免费看久久久香蕉| 成人影院在线观看视频| 色综合综合在线| 久久福利| 国产综合在线观看|