Guangzhou Steel Construction site quality management should be the appropriate technical standards, quality management system, quality control and inspection system, construction construction site due approval by the project technical director of design, construction scheme and other technical documents. Ago installation of steel structures, with careful design unit tests, mechanical mode clear steel system, construction loads, the structure to withstand dynamic loading and fatigue requirements, the technical preparations to ensure the structural safety.
Guangzhou Steel construction must go through metrological verification, calibration of measuring instruments qualified.
Familiar with the installation site of the surrounding environment, establish a reasonable measurement control network, preparing to meet the measurement requirements of the scheme member spatial orientation. Lifting the preparation program.
Contact with supervision units, the special construction process tests, or entrust qualified detecting unit, including soldering or welding procedure qualification test, the detection of high strength bolts or anti-slip coefficient retest, and other large equipment safety testing of the relationship between the structural safety of the process.
Steel engineering construction quality acceptance should be based on self-test unit, according to the inspection lot, sub-project program, subpart will be.