日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:2989

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 两个黑人一前一后好爽| 天天拍夜夜添久久精品中文| 日日操夜夜爽| 免费一级特黄a| 成人欧美一区在线视频在线观看| 美女黄网站免费| 中文一区二区在线观看| 中国毛片在线观看| 五月婷婷色综合| 日本午夜在线视频| 天堂成人在线观看| bl高h肉边走边做| 国外成人免费视频| 一级毛片高清| 福利片在线播放| 狠狠色丁香婷婷综合欧美| 亚洲视频毛片| 青草国产视频| 黄色网址免费在线播放| 欧美日韩在线成人看片a| 一级aa免费视频毛片| 日韩国产成人精品视频人| 中国一级特黄高清免费的大片| 欧美 国产 日韩 第一页| 国产成在线观看免费视频| 亚洲一区免费在线| 巨人导航收录500精品| 蜜桃丶麻豆91制片厂| aa级黄色片| 亚洲高清二区| 成 人 黄 色 视频播放16| 国内精品一区二区三区| 国产成人精品曰本亚洲77美色| 一二三四在线视频播放社区| 国产丝袜视频在线观看| 亚洲图片二区| 国产免费播放一区二区三区| 欧美日韩一二| 国产a级大片| 成人国产精品免费视频不卡| 精品国产无限资源免费观看|