日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:3091

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91精品国产91久久久久久青草 | 免费看羞羞视频的网站| 2017天天爽夜夜爽精品视频| 国产欧美日韩精品a在线观看高清| 欧美成人亚洲国产精品| 天天看片日日夜夜| 色网站免费在线观看| 韩国理论免费| 香蕉视频亚洲| 一级做a爰片久久毛片唾| 欧美三级欧美成人高清www| 国产在线一区二区| 超级黄色毛片| 国产无圣光高清一区二区| 久久精品国产半推半就| 无人区理论片手机看片| 中文字幕日韩高清| 久久人人澡人人爽人人爱| 天天摸日日舔| 欧美日韩免费在线| 一级黄色大片免费观看| 欧美特黄三级在线观看| 国产18页| metcn人体亚洲一区| 欧美18—19sex性护士| 日本一区二区免费在线观看| 中日韩免费视频| 日韩深夜福利| 中文字幕第98页小明免费| 中文字幕日本一区久久| 精品毛片视频| 成人午夜激情| 91无套极品外围在线播放| 2022精品福利在线小视频| 午夜看黄网站免费| 在线观看亚洲欧美| 欧美99视频| h黄漫画免费网站| 国产午夜视频在线观看第四页| 日韩黄a级成人毛片| 18成人在线观看|