Mr.Xu, the manager Of Foshan Shengbang Steel Structure Co. Ltd. had signed a contract with Pinda Technology(Thailand)Co.,Ltd on August 2016, for a project of workshop and warehouse covering a total area of 11100 square meters. The production was started on Sept. 2016 after confirming all design drawing details by both parties. The production has been finished after National Day Holidays, and now loading is under process,. All containers will be shipped on mid of Oct. to the destination port -- Bangkok Thailand.