As one of the building Foshan steel - steel plant, construction of steel structures is widely used, but sometimes we find that although the same as steel construction, two manufacturers of building the same type of steel plant, However, following some of the factors that affect the price range between the two.
1, Steel plant design type, the time required for the intended use of the plant;
2, the height of the steel plant will be charged for each additional two-thirds to three and a half percent of the cost according to the actual height of ten centimeters construction;
3, varying the amount of steel needed is one of the factors that, although it may be the same type of plant, but not the same amount of steel will make different prices;
4, steel span size is also a direct impact on the price factor, then the span is too large will increase with the required fee;
5, select the crane tonnage, tonnage crane choose will affect the cost of steel construction;
6, construction cost, installation and removal of windows and doors is also a slight impact;
7, the size of the construction area is naturally a more fundamental reason, the construction area is too large or small, have a direct impact on the cost of the steel plant, also because of this, it will be a main cause of the above other conditions.
Katsukuni Foshan Steel as one of the main steel structure of the steel plant design and construction, which have a reasonable price range, yet able to provide customers with affordable prices and build construction process.