日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4534

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一级特黄a视频| 人人爽天天碰天天躁夜夜躁| 精品久久久久香蕉网| 日韩国产午夜一区二区三区| 欧美成人免费一级人片| 国产国语videosex护士| 福利在线看| 亚洲欧美日韩不卡| 一本到视频| 91精品国产高清久久久久久| 欧美第四页| 欧美精品亚洲人成在线观看| 在线jyzzjyzz免费视频| 亚洲色图图片| 日韩一区二区三区在线视频| 天天天天躁天天天天碰| 日日噜噜夜夜狠狠久久丁香七| 国产一区二区三区高清视频| 深夜福利免费观看| 中文字幕25页| 天天爽夜夜爽8888视频精品| 欧美日视频| 在线播放精品视频| 在线播放黄| 国产成人a大片大片在线播放| 亚洲精品动漫在线| 一区二区三区欧美日韩| 香港国产特级一级毛片| 成在线人免费视频| 久久a热6| 国产精品推荐天天看天天爽| 日本不卡视频在线| 成人在线欧美| 国产啪视频| 插插宗合网| 在线观看免费视频一区| 久久天天躁夜夜躁狠狠躁2020 | 国产成人a v在线影院| 日本黄色免费一级片| 国产精品免费视频一区| 黄网视频|