raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4534

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一本高清| 欧美日韩亚洲综合在线一区二区| 国内精品久久久久不卡| 亚洲欧洲精品视频在线观看| 人人爱人人搞| 亚州久久| 成人精品视频一区二区三区尤物| 国产精品久久久久久久专区| 男男羞羞视频免费网站| 成人看毛片| 看全色黄大色黄大片免责看| 一级做a爰片性色毛片武则天五则| 黄色大片免费网站| 色欧美亚洲| 在线播放成人| 久久精品国产亚洲欧美| 极品色天使在线婷婷天堂亚洲| 欧洲日韩| 日韩欧美国产视频| 国产成人免费在线| 一级片麻豆| 综合国产在线| 国产高清美女一级a毛片久久| www黄在线观看| 欧美午夜性| 最近免费中文字幕mv| 国产第一页久久亚洲欧美国产| 97狠狠操| 国产69精品久久久久777| 免费无遮挡十八污污网站| 国产系列在线播放| 日韩深夜| 国产激情视频在线| 最近最中文字幕视频| 天天爽夜夜爽人人爽曰喷水| 天天综合天天做天天综合| 国产成人精品免费视频动漫| 一级毛片免费网站| 亚洲黄色影院| 国产1区二区| 国产一极毛片|