Steel supervision next station control points

Time:[2016-1-20]  Hits:4464

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲国产成人精品激情| 成人久久18免费网站入口| 综合玖玖| 午夜小视频免费观看| 60岁欧美乱子伦xxxx| 午夜在线观看网站| 在线观看免费亚洲| 免费搞黄网站| 国产年成美女网站视频免费看| 波多野结衣视频在线观看| 91抖音成人| 免费看一级黄色录像| 免费国产a国产片高清不卡| 黄色片视频免费看| 一级特级欧美午夜片免费观看| 一本大道香蕉最新在线视频| 污视频免费观看网站| 特级全黄一级毛片视频| 日本韩国三级在线| 91精品国产综合久久青草 | 日韩在线播放全免费| 午夜影院啊啊啊| 亚洲欧美一区二区三区在线播放 | 欧美成人性色xxxx视频| 亚洲高清国产一区二区三区| 亚洲黄色在线观看视频| 日日日天天射天天干视频| 中国videos18高清hd| 羞羞网站在线免费观看| 2021日日摸夜夜添夜夜添影院| xxxxx.日本| 成 人 免费 网站| 日韩欧免费一区二区三区| 中文亚洲动漫精品| www夜夜操com| aaa影院| 日本乱人伦片中文三区| 天堂视频在线| 国内精品一区二区在线观看| 日韩欧美一区二区三区不卡视频| 在线观看不卡视频|