日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Home > News > Guangzhou Steel news: the Zhoukoudian cave ape started
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn

Guangzhou Steel news: the Zhoukoudian cave ape started

Time:[2015-8-19]  Hits:5018

Guangzhou Steel news: the Zhoukoudian cave ape started "plus top"

 

Yesterday, the Zhoukoudian cave in the heart of the ape-man maintenance shed officially started construction. The maintenance shed in isolated rain, snow, hail, sun and other natural factors direct effect on the body at the same time the site will be possible to recover up to 20 million years ago, the original form.

The program of "minimum cover, to eliminate hidden dangers, with nature," the planning principles, to be built in the ape-man hole covers an area of ​​more than 3700 square meters of the maintenance shed. Maintenance shed span of 77.5 meters from north to south, east-west span of 54.5 meters and a maximum height of 35.7 meters, the use of space monolayer shells steel.

Site Management Office official said, the maintenance shed is the minimum required coverage area and height volume planning, site of the body in order to minimize interference, isolated rain, snow, hail, sunshine through the outer and inner layers of the roof build-planning, etc. the direct effect of natural factors on the ruins of the body, of the ape-man hole in the effective maintenance, while ensuring construction planning and site environment harmony. Guangzhou Steel

It is understood that the project is expected to end in late 2016. Pre-engineering will not cause too much impact on the visit, the site will divide the late opening hours.

According to reports, in order to make the Zhoukoudian site surrounding environment has been improved, the site perimeter has closed, shutting down the site surrounding nine cement plants, 11 shaft kiln production lines, 40 non-coal mines, 13 coal mines and other pollution and destruction of the natural environment industrial and mining enterprises, governance of the Zhoukoudian River and surrounding abandoned mines, planting more than 1,000 acres. Guangzhou Steel
■ Difficulties

1. Steel site construction is limited.

The construction site is located in the core area of ​​the ape-man cave, in the construction process does not destroy the ruins of the body, so the site layout is limited.

2. messy construction site environment.

Ape cave dense vegetation, narrow passageways, restricted construction conditions, lifting machinery is arranged with a certain degree of difficulty.

3. steel equipment and welding difficult.

Maintenance shed a single layer lattice shell structure, shape messy, slope, span, welding capacity, equipment and welding of steel structures request high.

The steel construction strict security measures.

As the construction site is located in the mountain below the maximum network shell drop of more than 30 meters, so the construction safety particularly high fall and fire will be among the control points of the project.

■ Introduction

Zhoukoudian cave ape's heart, and found about 40 representatives of "Peking Man," an individual close to 200 human fossils, more than one hundred thousand pieces of stone tools, several layers of ash and hundreds of kinds of animal fossils, is the most scientific value of the site iconic accumulation body, preserved ruins of the most complete stratigraphic sequence and the wealth of scientific information.

"200,000 years ago, there is a natural ceiling, but after the collapse when corrosion is now to be discovered." Site Management Office official said that since the twenties to explore, ape cave long suffered from sun, rain wind erosion and other natural forces of destruction, and therefore, from 2009 onwards, the joint to ape the West sectional hole excavations carried out maintenance work to clean up the disease according to the geological conditions and expert opinions, the cultural relics department and the Chinese Academy of Vertebrate Paleontology and Paleoanthropology, and start the Ape Man Cave collection maintenance plan, argument.

Tsinghua University Architecture Planning Institute Planning "Zhoukoudian first place (ape hole) Maintenance Plan Building Plan" was approved by the UNESCO World Heritage Centre and the National Heritage Board in 2013. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产成人综合久久精品亚洲| 色在线视频播放| 日本一本一区二区| 日韩人成免费网站大片| 日韩操比| 久久国| 成人开心激情| 日韩a一级欧美一级| 欧美精品一线二线大片| 老司机免费午夜精品视频| 国产一区国产二区国产三区| 高h辣h双处全是肉一对一| 91麻豆传传媒波多野衣久久看| 天天夜夜狠狠| 18成禁人视频免费| 欧美激情黄色| 18性夜影院午夜寂寞影院免费| 福利片影院| 一色屋免费视频| 国产乱人视频在线看| 成人香蕉视频| 欧美国产精品不卡在线观看| 男人下身进女人阳道视频| 免费可以看黄的视频 s色| 毛片免费看看| 久久久久久久国产a∨| 欧美日本免费| 永久免费在线视频| 各类毛片| 日韩新片在线观看| 日狠狠| 久久95| 欧美三级欧美一级| 天天射天天搞| 欧美超强性xxxxx| 老司机午夜影院| 亚欧乱色视频网站大全| 精品videoss另类日本| 日韩视频网址| 911精品国产亚洲日本美国韩国| 九九热精品在线视频|