日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5158

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美mv日韩mv国产mv网站| 在线播放一区二区精品产| 外国成人xxx在线视频| 在线看片你懂的| 亚洲欧美国产精品专区久久| 日韩在线 在线播放| 日韩欧美亚洲综合久久99e| 男人午夜禁片在线观看| tom影院亚洲国产一区二区| 久久综合九色综合97小说| 一级黄色毛片| 欧美一级久久久久久久久大| 视色视色| 99热国产精品| 日本www色视频萌爱网| 国产精品福利在线观看秒播| 9i9精品国产免费久久| 男女视频在线| 激情视频网站| 国产亚洲91| 天堂色视频| 99精品国产在这里白浆| 日日狠狠太爽爽| 日日操夜夜摸| 日本午色www高清视频| 成人免费网站视频www| 一级做a爰片欧美一区| 人人爽人人拍| 久久久噜噜噜久久网| 黄色国产在线观看| 国产精品天天看特色大片不卡| 真正免费一级毛片在线播放| 国产午夜在线视频| 日本高清视频成人网www| 亚洲依依成人综合网站| 伊人影视大全| 国产在线精品一区二区三区| bban在线| 在线观看免费视频黄| 朝鲜free嫩白的18sex性| 国产在线高清视频|