1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4556

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美一级www| 亚洲人成免费网站| 亚洲日韩中文字幕天堂不卡| 黄色三级在线| 人人擦| 在线三级网| 成人抖音破解| 免费观看黄色a一级视频播放| 一本久道久久综合| 一个人看的视频www| 性免费视频| 成人gav| 欧美午夜久久| 亚洲综合天堂网| 亚洲最大的视频网站| a毛片免费观看完整| 日韩在线二区全免费| 亚洲欧洲日韩在线| 日本高清中文字幕视频在线| 10周岁女全身裸无打码免费| 日韩精品一区二区三区中文3d| 国产精品国产三级国产爱网 | 国产成人精品免费视频大全办公室| 国产亚洲欧美成人久久片| 在线观看国产精品一区| 国产精品久久久久久影视| 女bbbbxxxx毛片视频0| 黄色片在线播放| 国产亚洲一区二区三区不卡| 丝袜调教视频| 成人性视频在线三级| 中国一级片免费| 五月天婷婷网站| 成人羞羞视频在线观看| 在线一级视频| 天天摸天天爽天天碰天天弄| 波多野结衣成人| 老司机午夜精品| 亚洲一级免费毛片| 黄色一级视频片| 天天摸夜夜|