日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Home > News > Control of welding process elements in steel structure design engineering
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn

Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:1488

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产精品综合久成人| 天堂va在线高清一区| 老湿影院在线看| 亚洲网视频| 精品无码久久久久久久动漫| 边做边叫床的大尺度视频免费| 久久影视一区| 日韩成人一级| 国产性大片黄在线观看在线放| 天天射影院| 欧美黄网在线| 免费成人毛片| 人人艹人人干| 全黄一级片| 国产偷国产偷在线高清| 偷偷操视频| 日本日日黄| 成人午夜18免费看| 成人精品第一区二区三区| 羞污影院| 99色视频在线| 亚洲免费色视频| 免费观看a级毛片在线播放| 寡妇一级a毛片免费播放| 日韩欧美国产高清在线观看| 免费一级片观看| 国产日产久久高清欧美一区| 小明永久免费看看| 天天摸天天添| 久久久午夜影院| 亚洲国产成人久久综合碰| 成人福利视频网址| 18videosex性vr日| 男女视频在线观看网站| 国内最真实的xxxx人伦| 日韩婷婷| 国产特黄1级毛片| 色综合久久久久久久久五月性色| 18av黄动漫在线观看| 骚片在线观看| 97在线免费视频|