Home > News > Problems needing attention in the process of steel structure construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn

Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2008

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 天天综合天天综合色在线| 一区在线观看| 伊人久久精品成人网| 免费人成在线观看网站| 2020久久精品亚洲热综合一本| 多人性激烈的欧美三级视频| 免费黄色一级片| 欧美资源网| 日日摸日日碰夜夜97| 日皮在线观看| 国产成人啪精品视频免费网站软件| 成熟女人50岁一级毛片不卡| 男人操女人免费网站| 久久性视频| 曰韩高清一级毛片| 国产日本视频| 免费人成激情视频在线观看| 久青草中文字幕精品视频| 最新精品在线视频| 久久精品午夜视频| 黄色三级免费看| 免费精品视频在线| free极度另类性欧美| 久久国| 免费观看无遮挡www的小视频| 最近的免费中文字幕1| 精品卡1卡2卡三卡免费网站 | 老司机免费精品视频| 欧美中文字幕在线看| 性激烈的欧美三级视频中文字幕| 国产欧美一区二区| 欧美最猛黑人xxxxx猛交| 亚洲国产激情一区二区三区| 一级特黄aaa大片在| 国产日韩精品一区二区在线观看| 一区二区三区在线免费视频 | 狼久久| 成人国产三级在线播放| 色香婷婷| 好好的日视频www| 插射视频|