日本久久久-日本久久久久久久-日本久久综合视频-日本老师xxxxxxxxx79-久操操操-久操成人

Language:CHINESESENGLISH

Home > News > FAQs
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.ewqkq.cn
Why timing roofing needs maintenance?
Why timing roofing needs maintenance? WHY why maintenance roofing needs timing? Foshan Steel Experience tells us: roofing needs 5-8 years to conduct a systematic overall view, maintenance or refurbishment intervals, this can effectively prevent damag...
2014/9/6
Prestressing steel reinforcement program
Prestressing steel reinforcement program [Problem] prestressed reinforcement steel student program? [Answer] prestressing steel reinforcement and construction technology program: Prestressing steel reinforcement program can be divided into two type...
2014/9/3
Multi-storey and high-rise steel column base grouting requirements
Multi-storey and high-rise steel column base grouting requirements [Student] multi doubt rise steel column base grouting and regulations? [Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom en...
2014/8/27
Steel construction?
Steel construction? 1, Foshan Steel system has a light weight, easy installation, short construction period, good seismic performance, contribution to recover faster, less environmental pollution and other comprehensive advantages, good ductility and...
2014/8/20
Features built steel structure analysis?
Features built steel structure analysis? Steel structure engineering technology uses Foshan Steel Works mainly in steel production, steel beams, steel columns, steel trusses and other components made ​​from steel and steel plate compositi...
2014/8/20
What are the characteristics of steel plant, composed of?
What are the characteristics of the steel structure plant, constitute? Foshan Steel plant refers to the use of steel and hot rolled, cold-formed or welded profiles made ​​by the convergence of convergence and transmission parts can with...
2014/8/20
FAQ steel welding process
FAQ steel welding disposal (B) the cold crack Generally refers to weld cold cracking during cooling down to the temperature changes in the temperature of martensite size (300-200 ℃ below) occurs, can be presented immediately after welding, and can ...
2014/8/16
Steel manufacture related test requirements?
Steel manufacture about experimental requirements? (1) Steel reinspection When the steel is one of the following conditions should be expected before processing the next reinspection: ① foreign steel imports; ② mixing different batches of steel ③ the...
2014/7/30
Control purposes tall buildings?
Control of high-rise building construction intentions? Foshan multi-layered steel high-rise buildings, the height of the large, high-rise buildings constructed in order to ensure the necessary rigidity Foshan Steel respond layer between the maximum d...
2014/7/26
The advantages and disadvantages of building steel plant?
Advantages and disadvantages of steel construction plant? Foshan Steel Advantages 1, widely use: apply to factories, warehouses, office buildings, stadiums, hangars and more. Both for single-large-span construction, can also be used to create a multi...
2014/7/26
Steel plant routine maintenance and upkeep of the building?
Construction of steel plant routine maintenance and conservation? 1, after we Foshan Steel plant installed on the owners concerned, can not be allowed to modify its structure, can not remove any of the bolts and other components, can not increase or ...
2014/7/26
Steel plant routine maintenance and upkeep of the building?
Construction of steel plant routine maintenance and conservation? 1, after we Foshan Steel plant installed on the owners concerned, can not be allowed to modify its structure, can not remove any of the bolts and other components, can not increase or ...
2014/7/19
page:13  1  2  3  4  5  6  7  8  9  10  11  12  13  14  pervious next  

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本a视频在线| 欧美在线欧美| 在线天堂中文在线网| 日本亚州视频在线八a| 视频一区 中文字幕| 国产欧美日韩在线| 成年男女男免费视频网站不卡| 九九色视频| 精品亚洲成a人片在线观看| 麻豆乐园| 国产午夜视频在永久在线观看| 精品亚洲性xxx久久久| 国产高清a毛片在线看| 九九精品视频在线| 国产亚洲成归v人片在线观看| 国产乡下三片在线观看64| 黄色视屏日本| 黄色短视频免费观看| 国产国产精品人在线视| 国产精品毛片一区二区三区| 国产精品伦理久久久久久| 国产成人精品亚洲2020| 草草影院第一页yycccom| 91短视频在线高清hd| 91探花福利精品国产自产在线| aa级黄色毛片| 国产1024观看免费视频| 国产一二三区在线观看| 国产一区视频在线免费观看| 激情网站网址| 欧美激情成人| 日韩成人综合网| 亚洲成人免费网址| 中文字幕一区二区在线播放| 笫一次爽女人免费视频| 国产青草| 一区二区三区日韩免费播放| 夜夜偷天天爽夜夜爱| 色姑娘天天干| 国产在线播放免费| 亚洲欧美日韩三级|